Safety is the method, not the message
Utility scale solar mechanical work happens near live equipment on high voltage sites. Our program is written down, trained, and applied the same way on every task.
Five commitments on every task
These are the controls that govern how a crew mobilizes, works and documents the result.
01Written safety program
Daily Job Hazard Analysis, a Hazardous Energy Control Procedure and LOTO Isolation Permit, and task risk assessments for the work at hand.
02Stop Work Authority
Every crew member holds Stop Work Authority. Any unsafe condition or unclear isolation stops the task immediately.
03Test before touch verification
Verification on 1,500 V DC systems before any mechanical work begins on an isolated string.
04Module Replacement Procedure
Model specific data sheets govern every swap. No approved data sheet, no swap.
05Workmanship documentation
A daily torque and serial number log signed by the client, with photos of the completed work.
Training our crews hold
- OSHA 30 / OSHA 10
- NFPA 70E electrical safety training
Safety documentation available to clients on request.
Need our safety documentation before you mobilize?
Tell us about your site and we'll send our program details and confirm how we work within your rules.